The tunnel link connects Karađorđeva Street with the Danube slope through a densely built part of central Belgrade. The works run between residential buildings, so every operation is planned for a tight space.
The steel sheet pile gallery holds the sides of the excavation while the installations are built inside it. We drive the piles in line and extract them once they are no longer needed.
Job details
- Location
- Belgrade, Despota Stefana Boulevard
- Service
- Driving and extracting sheet piles
- Investor
- Power China
On site
Works are in progress.

